What is KLIA 2?
The KLIA2 is built to be Malaysia's Next Generation Hub - International Airport Hub - that allows seamless connectivity for both local and international low-cost plus full-service carries.The KLIA2 is built to cater for the explosive growth in low cost travel. It is designed to cater 45 million passengers a year, replacing the Low Cost Carrier Terminal (LCCT) once it's ready. It is built with bigger capacity and superior facilities
When it is operating?
KLIA2 began operating 2 May 2014 and fully operational on 9 May 2014.
Estimated building cost
Built at an estimated total cost of RM 4 Billion.
Capacity
Capacity to accommodate 45 million passengers per year.
KLIA2 layout
Separate entrances / exits for domestic and international air travelers
80 aerobridges -no more open air walking to and from aircraft.
90 F&B outlets
6000 car park lots
How to get there?
By road-estimated distance of 69km from KL Sentral
Taxi fare from KL Sentral: RM62 - RM75 (depends on traffic)
Bus services from: KL Sentral, TBS, 1Utama
Rail services from KL Sentral: RM35
For more info, visit to www.klia2.info , photo credit to Mr. Google :)
Author: Anne Nabiela
No comments:
Post a Comment